IAPWS Annual Meeting 2022
 

Optional Field Trip

Friday December 2nd 2022

The site visit on Friday 2 December from 1.30pm will be to the Mercury NZ Kawerau Geothermal Power station which is 100 MW double flash direct contact geothermal power plant that was commissioned in 2008 and the Tuwharetoa Geothermal clean steam geothermal steam transformer plant that produces process steam for supply to local industries. 
 
To attend the site visit people need to be physically fit and able to walk around a industrial site and to have no cold and flu symptoms. 
 
Covered foot wear and long pants and covered arms are required to access the sites. 
 
https://www.mercury.co.nz/why-mercury/renewable-energy/geothermal-generation 
 
https://www.tuwharetoageothermal.co.nz