KEYNOTES
Overview of WSDOT Bridge Program
Pasco Bakotich III, Washington State Department of Transportation
Keynote: Overview of the Alaskan way Project
Linea Laird, Washington State Department of Transportation
Keynote: Whence and Whither Seismic Design? Past and Future
Perspectives on Bridge Seismic Design
Lee Marsh, BergerABAM
2A MAJOR BRIDGE DESIGN
PROJECTS
Prefabricated Decked Girders for Accelerated Bridge Construction in Washington State
Scott Sargent & Bijan Khaleghi, Washington State Department of Transportation
I-405 Sepulveda Pass Widening Design-Build
Y. Nein Wang & Aamir Durrani, HNTB Corporation
Sherman Lee, Kiewit Infrastructure West Co.
Replacement of the Sandy River 1-84 Bridges
Douglas Johnson, David Evans & Associates
2B ACCELERATED BRIDGE
CONSTRUCTION
The Shoo-Fly: Sliding the Sellwood Bridge
Scott Nettleton & Anthony Calcagno, TY Lin
Kenneth Huntley, Multnomah County, OR
Skagit River Bridge SR5/712 Collapse and Repair
Geoff Swett, Washington State Department of Transportation
Design and Construction of the SR 99 Atlantic Street Bypass
Nicholas Rodda, Washington State Department of Transportation
2C SEISMIC DESIGN CRITERIA
Performance Objectives and the AASHTO Guide Specifications for the LRFD Seismic Bridge Design
Elmer Marx, Alaska Department of Transportation
Seismic Design Criteria of a Cable-Stayed Bridge: An Owner’s Perspective
Paul Chung & Jason J. Q. Fung, CalTrans
Eric Abrahamson & Fletcher Waggoner, SC Solutions Inc.
2D BRIDGE REHABILITATION
Hagwilget Suspension Bridge Refurbishment, Hazelton, BC
Jeff Mellor, Buckland & Taylor
Rehabilitation of Long Span Bridges
Adrian Ciolko & Chris Ligozio, KPFF Consulting Engineers
Bayonne Bridge “Raise the Roadway” Project
Chester Werts, HDR Engineering Inc.
3A MAJOR BRIDGE DESIGN
PROJECTS
State-of-the-art Report on FULL-DEPTH PRECAST CONCRETE BRIDGE DECK
PANELS
William Nickas, PCI Transportation Systems
Bridgelation on the I-4/Selmon Expressway Connector Project
Morad G Ghali & Kenneth C. Saindon, Atkins Global
The Truss Span of the S. Omaha, Missouri River Bridge
Kevin R. Eisenbeis, Burns & McDonnel
3B ACCELERATED BRIDGE
CONSTRUCTION
Time is of the Essence: OR43 Oregon City Bridge Rehab Scheduling
Daniell Pavela, T.Y. Lin
The
Use of Accelerated Bridge Construction Techniques in the New Fraser Heights
Bridge, Surrey, BC,
Canada
Uri Wexler, David Harvey & Don Kennedy, Associated Engineering
Accelerating Bridge Construction: Recent Applications in California
Paul Chung & J.W. Fang, CalTrans
3C SEISMIC DESIGN
Design of the SR520 West Approach Bridge Using Seismic Isolation Bearings
Greg Knutson & Paul Bott, HDR Engineering Inc.
As-Built Seismic Analysis of the Golden Gate Bridge Main Suspension Spans
Ted Bush & Kuang Lim, HDR Engineering, Inc.
Young Deng, Tom Lee, Gernot Komar & Omar Jaradat, Moffat &
Nichol
3D BRIDGE REHABILITATION
Keene Road Railroad Bridge Conversion for Vehicular and Pedestrian Use
David K. McMullen, KPFF Consulting Engineers
Rehabilitation of the Historic Oregon City Arch OR43: Willamette River Bridge
Eric Bonn & Jason Kelly, OBEC Consulting Engineers
Emergency Stabilization and Rehabilitation of the Simpson Bridge
Anthony Mizumori & Glen Scroggins, Washington State Department of
Transportation
4A BRIDGE DESIGN CASE STUDY
State of the Practice and Advances in Buried Bridges
Joel Hahm, Big R Bridge
Travis Arndt & Leslie Daugherty, Alaska Department of
Transportation
A Constructible Bridge Bent Designed to Re-center After an Earthquake
John Stanton, Marc Eberhard, Phillip Davis, Travis Thonstad, Bryan
Kennedy & Jeffrey Schaefer, University of Washington
4B BRIDGE DECK CONSTRUCTION
ABCs of Crack-Less Bridge Decks, with Applications in Accelerated Bridge Construction
Sonny Fereira, CalTrans
How to Specify and Construct Durable Crack Free Bridge Decks: Washington State Experience
Mark Gaines, Washington State Department of Transportation
Mohammad Sheikhizadek, David Evans & Associates
Re-Surfacing the Orthotropic Steel Deck of the Freemont Bridge in Portland, OR
John Hinman, Donald Wagner & Charles Seim, CH2M Hill
4C SEISMIC RETROFIT
Seismic Retrofit Program Priorities and Options for Oregon
Bruce Johnson, Oregon Department of Transportation
Seismic Retrofit of Dumbarton Toll Bridge
Tariq Masroor, Steve Mitchell & Jay Quiogue, CalTrans
Operability Retrofits for BART’s North Oakland Aerial Guideways
Hassen Beshir, BART
Matthew Paradis, HNTB Corporation
4D BRIDGE LOAD RATING
Improved Load Rating of Existing Bridges for Permit Trucks
Vietanh Phung & Kash Nikzad, Tran Tech Engineering
Load Rating for Two Steel Bridges
Jingjuan Li, RHC Engineering Inc
Methods for Improving Load
Ratings of Existing Bridges
Scott Loptson, Kent LaRose & Ruby Kwan, Morrison Hershfield
5A DESIGN AND CONSTRUCTION OF
ARCH BRIDGES
Design, Construction and Structural Health Monitoring of a Steel Arch Bridge
Aleksander Nelson & Hussein Khalil, HDR Engineering Inc.
Ahmad Abu-Hawash, Iowa Department of Transportation
Brent Phares & Terry Wipf, Iowa State University
Sellwood Bridge Project: Final Design of the Main Crossing Arch Bridge
Ian Cannon, Multnomah County, Oregon
Mike Lopez & Eric Rau, TY Lin Corp.
Design and Construction of the Bronco Arch Replacement Bridge
Gregg A. Reese, Summit Engineering Group Inc.
5B BRIDGE PRESERVATION
Developing an Effective Bridge Preservation Program
Chris Keegan, Washington State Department of Transportation
Precast-Prestressed Bridge Girders Damaged by High Load Impacts
Richard Brice & Lynn Peterson, Washington State Department of Transportation
How Do You Inspect Something You Can’t See? Oregon’s Experience in a Pilot Program to Test PT Ducts
Marie Kennedy, Oregon Department of Transportation
5C SPECIAL DESIGN AND
CONSTRUCTION
Design of the Truckee River Bridge
William Rodriguez, TY Lin
Travis Arndt & Leslie Daugherty, Alaska Department of Transportation & Public Facilities
Design of Keechelus Lake Avalanche Bridges
Cory Caywood & Kevin Dusenberry, Jacobs Engineering
5D LIGHT RAIL BRIDGE PROJECTS
Design of the East Link Aerial Guideway Structures in Bellevue, WA
Jerry Dorn, HNTB
PHX Sky Train: Taking Trains Under Planes
David Burrows, Gannett Fleming, Inc.
Thomas R. Cooper, Parsons Brinckerhoff
6A DESIGN AND CONSTRUCTION OF
STEEL BRIDGES
Kaiyuan Liu, Parsons Brinckerhoff
David Mukai, University of Wyoming
Challenges of the Design and
Construction of Steel Bridge over Ebey Slough in Washington State
Loung (Lou) H. Tran, Washington Department of Transportation
Design & Construction of the Shenandoah River Bridge Steel Delta Frame
Jason Fuller & Matthew Bunner, HDR Engineering Inc.
6B BRIDGE MANAGEMENT
Bridge Paving Design, Construction, and Management
Bruce Thill, Washington Department of Transportation
Improving Load Ratings & Bridge Management Decisions: Field Testing of the Jackson St. Bridge
Brice Carpenter & Brett Commander, Bridge Diagnostics Inc.
Greg Kim, Seattle DOT
WSDOT’s Bridge Management and Performance Measures
DeWayne Wilson, Washington State Department of Transportation
6C BRIDGE RESEARCH
Seismic Design of Concrete Filled Tube Columns and Their Connections
Charles W. Roeder, Dawn E. Lehman & Max T. Stephens, University of
Washington
Jiho Moon, Korea University, Seoul South Korea
Controlling Cracking at the Ends of Pretensioned Concrete Bridge Bulb Tee Girders
Pinar Okumus, Worcester Polytechnic Institute
Michael G. Olivia, University of Wisconsin
Socket Connections for Rapid Construction of Bridge Bents with Spread Footings
John Stanton, Marc Eberhard & Olafur Haraldsson, University of
Washington
6D BRIDGE AESTHETICS
Genesee Avenue Pedestrian Overcrossing: A Concrete Bridge with High Degree of Curvature
Paul Morel, Kleinfelder/Simon Wong Engineering
Bridge Architecture: Current
Trends: A West Coast Bridge Architect’s Perspective
Michael Fitzpatrick, T.Y. Lin
Paul Kinderman, Washington State Department of Transportation
Aesthetic Bridge Rails and Barriers in California
Shannon Post, CalTrans
7A SPECIAL BRIDGE DESIGN AND
CONSTRUCTION
Landmark in the Works: Novel Use of Post- Tensioning in Highly Curved Bridges
Claudio Osses, Huanzi Wang & Richard Patterson, AECOM, Buckland
& Taylor
Design of the SR 99 Bored Tunnel and Approach Structures in Seattle, WA
Jerry Dorn, HNTB Corp
Accelerated Design/Construction Using Prefabricated Bridge Components
Merv Ericksson, DJ & A
7B BRIDGE PRESERVATION
Summary of Critical Findings Reviews for the National Bridge Inspection Program
Brian J. Leshko, HDR Engineering Inc.
Field Application of Ultrasonic Phased Array for Structural Evaluation
Curtis Schroeder, Fish & Associates Inc.
Rope Access Investigation and Emergency Repair of the Diefenbaker Bridge Girder Fracture
Reed Ellis, Nicholas Cioffredi & Frank Block IV, Stantec Consulting
Services, Inc.
7C BRIDGE DESIGN CASE STUDY
Design and Construction of Fresno SR 180 Braided Ramp Design Build Project
Sammy Tu, ARUP
John Pologar, Walsh Group
Precast Girder and Integral Bent Cap for the Sunset Blvd and Skirball Center Drive Crossing Bridges
Patrick W. Pence, Evelyn Y. Liang & Luan S. Go, HNTB Corp
KookJoon Ahn, CalTrans
Structural Design Complexity of Presidio Parkway CIP/PS Solid Slab Bridges
Ali Rejaie, Kuan Go & Evelyn Liang, HNTB Corp.
7D BRIDGE REHABILITATION
Seismic Retrofit and Rehabilitation of the Laurel Street Overcrossing
Peter Smith, T.Y. Lin
US-2 Moyie River Gorge Bridge Rehabilitation
Dan Gorley & Kenneth Clausen, Idaho Department of Transportation
Reconstruction of the New Jersey Turnpike Authority’s Easterly Hackensack River Bridge
Richard Schaefer, HNTB Corp.
Andrew Kamilaris, Dewberry Engineers
Kevin M. Healy, NJ Turnpike Authority
8A BRIDGE DESIGN POLICIES
Evaluation of Common Design Policies for Precast Prestressed I-Girder Bridges
Richard Brice & Bijan Khaleghi, Washington State Department of
Transportation
Stephen J. Seguirant, Concrete Technology Corp.
Stability of Straight Steel Plate Girders During Construction
Robert C. Gale, Buckland & Taylor
Analysis Of Curved And Skewed Steel Girder Bridges During Construction
Andres Sanchez, Brandon Chavel & Somenic Coletti, HDR Engineering
Inc.
Cagri Ozgur, Rizzo Associates
Donald White, Georgia Institute of Technology
8B GEOTECHNICAL DESIGN
Monique Anderson, Shannon & Wilson
Jim Struthers, Washington State Department of Transportation
Wishkah Bridge Replacement-Designing for Significant Landslide Movement
with Conventional
Anne Fabrello-Streufert, Aaron Olson & Jason Pang, KPFF Consulting
Engineers
Shaft Base Grouting-Perching Deep Foundations in Specific Soil Layers
Stuart Bennion, BergerABAM
8C BRIDGE DESIGN CASE STUDY
The Two Medicine River Bridge: Montana’s First Posttensioned Concrete Box-Girder Bridge, Glacier, MT
Tony Kojundic, Elkem Materials, Inc.
The First Thermoplastic Bridges Located in U.S. Highways (5)
Vijay Chandra & John S. Kim, Parsons Brinckerhoff
Southbound US-191 Cold Creek Canyon Bridge
Chayan Bhattacharyya & Mike Morrison, Arizona Department of Transportation
8D PREFABRICATED BRIDGE
ELEMENTS AND SYSTEMS
Design and Construction Solutions for I-84 Over Northside Boulevard and the UPRR Spur Line
Dan Gorley, Idaho Department of Transportation
Kenneth Clausen, Idaho Department of Transportation
Construction Difficulties in Rural Arizona
Amjad Alzubi, Arizona Department of Transportation, Bridge Group
M. “Saiid” Saiidi, University of Nevada, Reno
Brian Nakasoji, University of Nevada
Jedediah Bingle, Washington State Department of Transportation
9A CABLE SUPPORTED BRIDGES
Tower Erection Engineering for
the San Francisco- Oakland Bay Bridge Self-anchored Suspension Span
B. Hammersley, Klohn Crippen Berger Ltd.
W. Wu, B. Hammersley & D. Dowedell, Wu and Dowedell Associated
N. Greco, American Bridge Company
Fabrication of the Deh Cho Bridge Pylons
Paul King, Rapid-Span Structures, Ltd.
Innovative Methods for Inspection of Cable-Stayed Highway Bridges, Old and New
Scott Wyatt, KPFF Consulting Engineers
Chris Ligozio, KPFF Consulting Engineers
9B LIGHT RAIL BRIDGE PROJECTS
D to M Streets Track and Signal Improvement Project: Pacific Avenue Bridge
Thomas R. Wilson & Erick Kelly, Parsons Brinckerhoff
History of Accelerated Bridge Construction
M. Lee Marsh, James S. Guarre, Robert F. Mast & Greg A. Banks,
BergerABAM
Gusset Plate Triage Analysis for Steel Trusses in Washington
Patrick Gallagher, Washington State Department of Transportation
9C BRIDGE DESIGN CASE STUDY
Washington Street Overcrossing-Accelerated Bridge Construction Methods: Concept to Completion
Andy Howe & Jason Kelly, OBEC Consulting Engineers
Evan Sinn & Scott Nettleton, T.Y. Lin
Michael Knott, Eric Nichol & Mikele Winters, Moffat & Nichol
9D BRIDGE INSTRUMENTATION
Force Monitoring of Post-Tensioning Tendons and Cable Stays in Bridge Structures
Shahid Islam, DYWIDAG-Systems International
Instrumentation and Structural
Health Monitoring of the Galena Creek Bridge
Troy Martin, Nevada Department of Transportation
Images at Depth-The Use of Acoustic Imaging on Large River Crossings: A Case Study
Jeffrey B. Rowe, Infrastructure Engineers Inc.
Kenneth LaBry, CH Fenstermaker & Associates, LLC
-- |