10th Australian Small Bridges Conference 2021
 
Railway Bridges:
Bridges for Railways have featured at all nine of the previous Australian Small Bridges Conferences and will do so again in 2021. 
 
While many of our presentations are relevant for all uses of bridges, we will have presentations that specifically feature railway bridges and these include: 
 
Ali Chaboki
Principal Engineer- Structures
V/Line
MAINTENANCE OF RAIL IN CONCRETE DECK BRIDGES IN REGIONAL VICTORIAN RAILWAY
 
 
Anant Gupta
Principal Structural Engineer and Design Manager
Metro Trains Melbourne
INNOVATIONS AND CHALLENGES: MAINTENANCE AND ACCESS PROVISIONS IN A RAIL VIADUCT WITHIN BROWNFIELD CORRIDOR
 
Sylvia Korlos
Structural Engineer
AECOM
Louis Walsh
Technical Director - Civil Infrastructure
AECOM
DESIGN CHALLENGES IN THE RAIL CORRIDOR - LOVERS WALK PEDESTRIAN BRIDGE, SOUTH YARRA , VICTORIA
 
Rob Pallot
Senior Engineer - Bridges and Structures
SMEC
COMPETING DESIGN PRESSURES BETWEEN SITE-SPECIFIC SOLUTIONS AND UNIFORM PROJECT-WIDE SOLUTIONS FOR STRUCTURAL PEDESTRIAN OVERPASS DESIGNS AT RAILWAY STATIONS
 
 
Dr Dominique Cavell
Technical Director
Aurecon
Mahes Rajakaruna
Structures Design and Standards Engineer
Main Roads Western Australia
USE OF STRAIN SENSOR TECHNOLOGY AND ANALYTICAL MODELLING FOR BRIDGE PERFORMANCE ASSESSMENT OF BRIDGE NO 1223, WA
 
Ben Chung
Senior Technical Director – Structures
GHD
Vahid Manoochehrikian
Senior Structural Engineer - Bridges
GHD
Luke Weatherstone
Structural Engineer
GHD
FATIGUE ASSESSMENT OF A STEEL THROUGH GIRDER RAIL BRIDGE USING AS 5100-2017
 
Dion Christian
Diagnostic / Remedial Engineer
Absafe
REPLACEMENT OF CROSS-GIRDERS ON KURANDA RAIL LINE BRIDGE, CAIRNS FNQ
 
 
Kim Guttridge
Senior Principal Structural Engineer
WSP
Tim Pistono
Structural Engineer
WSP Aurecon
Satyajit Datar
Technical Director, Infrastructure,
Aurecon
EMBANKMENT RETAINING WALLS CONSTRUCTED IN A NARROW RAIL CORRIDOR
 
David Han
Bridge Structures Manager
Rockfield Technologies Australia
Bill Weston
Senior Project Engineer
Queensland Rail
LONGITUDINAL BRAKING/TRACTION AND THERMAL FORCE ASSESSMENT FOR RAILWAY BRIDGE TO AS5100:2017
 
Rupert Noronha - 2
Section Engineer
Morgan Sindall
CONSTRUCTION OF STAMFORD RAIL UNDERBRIDGE - UNITED KINGDOM
 
 
Ken O'Neill
NSW Bridges Leader
Aurecon
THE “DOS AND DON’TS” OF REPLACING A 1930S CONCRETE BRIDGE WITH A NEW STEEL TRUSS BRIDGE AT A HIGH SKEW
 
Daniel Stephenson
Lead Structural Engineer
Rockfield Technologies Australia
Eyal Azulay
Senior Civil Engineer
Queensland Rail
STEEL TRUSS LOAD ASSESSMENT FOR AGING BRIDGES USING FEA AND AS5100:2017
 
Ian Ward
Associate Director and Roads & Rail Leader (Vic),
TSA Management
RETAINING WALL SYSTEMS INTERFACING WITH BRIDGE ABUTMENT WALLS
 
Read all of our Abstracts for the above Topics  HERE