10th Australian Small Bridges Conference 2021
 
Our Topics on Bridge Maintenance , Repair, Refurbishment and Strengthening include:
 
Tim Shaw
Structural Engineer - Bridges
GHD
Daniel Anstice
Technical Director – Materials Technology
GHD
RESTORING CORRODED AND DEFICIENT PIERS – DURABILITY AND STRUCTURAL STRENGTHENING SOLUTION OF DUNBOGAN BRIDGE PIERS
Ali Chaboki
Principal Engineer- Structures
V/Line
MAINTENANCE OF RAIL IN CONCRETE DECK BRIDGES IN REGIONAL VICTORIAN RAILWAY
 
Tanmay Vegad
Structural Engineer
Hatch
Matt Proitsis
Principal Structural Engineer
Hatch
INNOVATIONS IN BRIDGE DESIGNS INCLUDING BARRIERS, HANDRAILS AND STRENGTHENING OF EXISTING BRIDGES TO NEW CODE REQUIREMENTS – WESTERN ROADS UPGRADE PROJECT IN MELBOURNE
 
Stephen Richards
Contracts and Client Relations Manager,
Wood Research and Development
REVIEW OF LOG GIRDER BRIDGE CONNECTIONS – SUGARLOAF ROAD BRIDGE
 
Rhett Watters
Specialist Structural Engineer – Bridges and Materials
pitt&sherry
TRANSPORT INFRASTRUCTURE STRUCTURAL INVESTIGATION AND REPAIR – DEVELOPING EFFECTIVE REMEDIAL ENGINEERING SOLUTIONS
 
Antony Andradi
Senior Engineer Pavement and Structures
Logan City Council
PLANNING FOR REPAINTING AND STRUCTURAL REPAIRS OF RED BRIDGE, BEENLEIGH
 
Matt Duncanson
Senior Engineer – Materials Technology
SMEC Australia
REVIVING AN ICONIC STRUCTURE – REPAINTING AND STRUCTURAL REPAIRS TO THE LOGAN RIVER RED BRIDGE
 
Peter Routledge
Technical Principal
WSP Opus NEW ZEALAND
THE RAKAIA GORGE BRIDGE DECK REPLACEMENT AND SEISMIC STRENGTHENING
 
Paul Lunniss
Project Manager
Inner West Council
Alistair Hyde Page
Environmental Engineer
Inner West Council
DIBBLE AVENUE WATERHOLE SLOPE STABILISATION – FORMER BRICK PIT REHABILITATION IN DENSE URBAN ENVIRONMENT
 
Marcia Prelog
Associate
Aurecon
THARWA BRIDGE MAINTENANCE – LESSONS LEARNT
 
John Vazey
Engineering Manager
EngAnalysis
PRACTICAL OBJECTIVE REVIEW OF A DAMAGED CULVERT
 
Jimmy Wong
Senior Structural Engineer
GHD
MOUNT STREET PEDESTRIAN BRIDGE – REPLACEMENT OF CENTRAL MAST AND EXTERNAL STAYED CABLES
 
Dion Christian
Diagnostic / Remedial Engineer
Absafe
REPLACEMENT OF CROSS-GIRDERS ON KURANDA RAIL LINE BRIDGE, CAIRNS FNQ
 
 
 
Read all of our Abstracts for the above Topics  HERE