10th Australian Small Bridges Conference 2021
 
Our Local Government Topics include:
Stephen Wood
Bridge and Structures Engineer
Port Macquarie - Hastings Council
REPLACEMENT OF THREE TIMBER BRIDGES IN 30 DAYS BY PORT MACQUARIE-HASTINGS COUNCIL
 
Paul Lunniss
Project Manager
Inner West Council
Alistair Hyde Page
Environmental Engineer
Inner West Council
DIBBLE AVENUE WATERHOLE SLOPE STABILISATION – FORMER BRICK PIT REHABILITATION IN DENSE URBAN ENVIRONMENT
 
Antony Andradi
Senior Engineer Pavement and Structures
Logan City Council
PLANNING FOR REPAINTING AND STRUCTURAL REPAIRS OF RED BRIDGE, BEENLEIGH
 
Matt Duncanson
Senior Engineer – Materials Technology
SMEC Australia
REVIVING AN ICONIC STRUCTURE – REPAINTING AND STRUCTURAL REPAIRS TO THE LOGAN RIVER RED BRIDGE
 
Donald Richardson
Managing Director
Tiaki Engineering Consultants NEW ZEALAND
Jeandré le Roux
Bridge Design Engineer
Tiaki Engineering Consultants NEW ZEALAND
THOMPSONS HORTICULTURE BRIDGE - DESIGN OF 96M MULTI-SPAN COMPOSITE BRIDGE
Dr Dan Tingley - 2
Senior Engineer and Wood Technologist
Wood Research and Development, CANADA
TIMBER UPGRADES AND REPAIRS TO SUSTAIN HISTORICAL LANDMARK - SOUTH ARM BRIDGE, BYRON SHIRE COUNCIL
 
Dr Torill Pape
Technical Director Transport,
AECOM
Susie Seeto
Structural Engineer
AECOM
TIMBER BRIDGE REPLACEMENT STRATEGY
 
Tim Chappell
Senior Engineer
Tasmania Parks and Wildlife Service
A RISK-BASED APPROACH TO MANAGEMENT OF REMOTE VEHICLE AND PEDESTRIAN STRUCTURES IN TASMANIA
 
Stephen Richards
Contracts and Client Relations Manager,
Wood Research and Development
REVIEW OF LOG GIRDER BRIDGE CONNECTIONS – SUGARLOAF ROAD BRIDGE
Logan Mullaney
Managing Director
InQuik Bridging Systems
ACCELERATED PROGRAM TO REPLACE 3 LOAD LIMITED TIMBER BRIDGES FOR THE UPPER LACHLAN SHIRE COUNCIL TO SM1600
 
Robert Meiklejohn
Senior Professional
arrb
Tim Heldt
Chief Technology Leader
arrb
TRANSITIONING TO A RISK-BASED STRUCTURES MANAGEMENT APPROACH FOR LOCAL GOVERNMENT
 
John Vazey
Engineering Manager
EngAnalysis
PRACTICAL OBJECTIVE REVIEW OF A DAMAGED CULVERT
 
Jimmy Wong
Senior Structural Engineer
GHD
MOUNT STREET PEDESTRIAN BRIDGE – REPLACEMENT OF CENTRAL MAST AND EXTERNAL STAYED CABLES
 
Gavin Chadbourn
Manager- Asset Strategy & Planning
pitt&sherry
Rhett Watters
Specialist Structural Engineer – Bridges and Materials
pitt&sherry
FROM DATA TO INFORMATION – BRIDGING THE GAP ON HOW TO INCREASE VALUE FROM INSPECTION PROGRAMS
 
Felix Lie
Bridge Engineer
Jacobs
DESIGN OF PEDESTRIAN BRIDGES