Our Topics on Bridge Inspection and Assessment include: |
Susie Seeto Structural Engineer AECOM Sally Farquhar Senior Structural Engineer AECOM Dr Torill Pape Director Structures Design, Review and Standards Department of Transport and Main Roads TIMBER BRIDGE REPLACEMENT STRATEGY |
TIMBER BRIDGE REPLACEMENT STRATEGY |
Tim Chappell Senior Engineer Tasmania Parks and Wildlife Service A RISK-BASED APPROACH TO MANAGEMENT OF REMOTE VEHICLE AND PEDESTRIAN STRUCTURES IN TASMANIA |
Satyajit Datar Technical Director, Infrastructure Aurecon Zarinne Seow Structural Engineer Aurecon Kanjana Siamphukdee Bridge Engineer Aurecon STRUCTURAL ANALYSIS OF BURIED CORRUGATED METAL CULVERTS |
Sam Mathankar Asset Manager Structures Main Roads Western Australia Arash Groban Principal Bridge Engineer AECOM Dr Liam Holloway Managing Director MEnD Consulting LEVEL 3 INSPECTION AND LOAD RATING OF BRIDGE 1011 HALF JOINTS |
John Vazey Engineering Manager EngAnalysis PRACTICAL OBJECTIVE REVIEW OF A DAMAGED CULVERT |
Hai Le - 2 Senior Bridge Engineer GHD NEW STRUCTURAL ANALYSIS SOFTWARE FOR BRIDGE NETWORKS |
Gavin Chadbourn Manager- Asset Strategy & Planning pitt&sherry FROM DATA TO INFORMATION – BRIDGING THE GAP ON HOW TO INCREASE VALUE FROM INSPECTION PROGRAMS |
Dr Farhad Nabavi Managing Director Technocrete Consulting Engineers INSPECTION, CONDITION ASSESSMENT, AND MODELLING AND PREDICTION THE RESIDUAL SERVICE LIFE OF CONCRETE BRIDGE STRUCTURES |
Elijah Holland Structural Engineer Aurecon DEEP SCOUR ANALYSIS AND FLOOD LOADING ON SUBMERGED BRIDGES |
Dr Dominique Cavell Technical Director Aurecon Mahes Rajakaruna Structures Design and Standards Engineer Main Roads Western Australia USE OF STRAIN SENSOR TECHNOLOGY AND ANALYTICAL MODELLING FOR BRIDGE PERFORMANCE ASSESSMENT OF BRIDGE NO 1223, WA |
David Han Bridge Structures Manager Rockfield Technologies Australia Bill Weston Senior Project Engineer Queensland Rail LONGITUDINAL BRAKING/TRACTION AND THERMAL FORCE ASSESSMENT FOR RAILWAY BRIDGE TO AS5100:2017 |
Daniel Stephenson Lead Structural Engineer Rockfield Technologies Australia Eyal Azulay Senior Civil Engineer Queensland Rail STEEL TRUSS LOAD ASSESSMENT FOR AGING BRIDGES USING FEA AND AS5100:2017 |
Ben Chung Senior Technical Director – Structures GHD Vahid Manoochehrikian Senior Structural Engineer - Bridges GHD Luke Weatherstone Structural Engineer GHD FATIGUE ASSESSMENT OF A STEEL THROUGH GIRDER RAIL BRIDGE USING AS 5100-2017 |
Read all of our Abstracts for the above Topics HERE